BIM Coordination & Protocols

BIM Coordination Protocols

BASEPIN’S SPECIFICATIONS SET COMMON RULES THAT ALL TEAMS PLAY BY. WINNING IS A COMMON GOAL & RISK IS SHARED BY ALL STAKEHOLDERS. COLLABORATION REPLACES COMPETITION & YOUR TEAM BECOMES COLLEAGUES NOT ADVERSARIES.

  • Project Information Matrix: Information about the project & team member BIM capability is discovered early to identify any scope gaps in the coordination requirements.
  • Basepin BIM QC Protocol: Used by the team to produce fully coordinated field installation drawings ahead of construction.
  • BIM Coordination Superplots: Coordinated building BIM systems are overlaid & signed off by the GC & subcontractors.
  • BIM File Naming & Management: Beginning at design phase BIM files are named to support the owner’s facility management standards.
  • 3D Clash Management: BIM files are analyzed for clashes. These clashes are tracked & resolved with documentation to support field installation
    work.
  • Process Flow Diagramming: The BIM Coordination process is diagrammed with roles & responsibilities customized to the project.

View or Download  Basepin Services Qualifications

Get Started
protocols-1024x545.png

Sign up for our news letter

Blog subscribers get email updates daily, weekly, or monthly. Automagically.

About Us

MISSION:

Basepin’s mission is to provide a revolutionized building information management system and technology platform to the construction and real estate industries. Our purpose is to be the collaborative method of connecting project members to each other and to the project or facility with accessible, accurate, and real-time information.

VISION:

To be the real-time point of collaboration for project members.

Contact Us [fa icon="long-arrow-right"]

Contact Us

[fa icon="phone"]  888.418.2224

[fa icon="envelope"]    Email Basepin

© 2013 Basepin Inc. All Rights Reserved. | Basepin and Basepin Connect are trademarks of Basepin, Inc. U.S. Patent Pending.

Share by: